Plan Year: 2020
Power:
Mitigation Action: Install in-place backup generators at water wells so water can continue to flow during power outages and natural disasters (p.285), U/G powerlines, improve overhead lines to non-curch and water well locations (p.288), Install in-place backup generators at each lift station so sewer can continue to flow to the WWTPs during power outages and natural disasters (p.289).
Distribution:
Mitigation Action: Transmission & Distribution Building Rehabilitation and Hardening (p.289).
Utility:
Mitigation Action: ASTCA project to replace overhead utility poles and cable with underground conduits and vaults (p.285).